Perfect 10 Pools starts with an excavation with the skills of an experienced backhoe operator.
Typically, the side excavation is estimated 2’ beyond the completed pool perimeter. We do this to allow for assembly and installation of concrete footing.
Then we include the assemble the steel panels, galvanized steel walls, and stairs, coping receptor, skimmer, and inlets as well as suction and return plumbing to the project site.
We always utilize a vermiculite
concrete bottom that is hand trolled.
We never leave a soil only bottom underneath the liner.