Step 1 - Excavation

Perfect 10 Pools starts with an excavation with the skills of an experienced backhoe operator.


Typically, the side excavation is estimated 2’ beyond the completed pool perimeter. We do this to allow for assembly and installation of concrete footing.

Step 2 - Wall Assembly and Construction of Pool Bottom

Then we include the assemble the steel panels, galvanized steel walls, and stairs, coping receptor, skimmer, and inlets as well as suction and return plumbing to the project site.


We always utilize a vermiculite
concrete bottom that is hand trolled. We never leave a soil only bottom underneath the liner.

Step 3 - Electric Installation

We install electrical components for your pool.

Step 4 - Liner Installation and Water Fill

After we install the liner, you’ll see why we stand apart with our experience.


Now we are ready to fill your swimming pool with water.

Step 5 - Concrete Decking

Installing the concrete deck is the final step.